Proposal/Job Go Back
Proposal/Job Information
Industrial Builders, Inc. - Casselton, ND 58078
52x32 LNR Proposal 2021
HTS-4118-0721
Liner - New
0.00
n/a
7/30/2021
50583.00
Closed/Stale
n/a
0.00
9/30/2021
n/a
Job Details/Notes
Chris Schultze
Material: $33,041
Geotextile: $2,762
SS Hanging Bolts: $2,180
Installation: $12,600
Travel Days: 2.5
Installation Days: 2
Material: $33,041
Geotextile: $2,762
SS Hanging Bolts: $2,180
Installation: $12,600
Travel Days: 2.5
Installation Days: 2
Address Information
David Goulet
Casselton
ND
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
