Proposal/Job Go Back
Proposal/Job Information
Cooperative Producers, Inc (CPI) Hastings, NE 68901
6-104x32 LNR Tanks 2020
HT-19-Q958 E
Liner - New
0.00
n/a
4/22/2020
3148920.00
Closed/Signed Job
n/a
0.00
4/23/2020
n/a
Job Details/Notes
03/08/2021 Tank - $502,720 each + GB - $22,100 each = $524,820 each x 6 = $3,148,920 SB
4/22/2020 - Rev E - SS GB Installed at Reg GB price of 22100 each- Price does not include tx at 7% - 21550 each times 6 tanks - 129300
Opt A - SS Internal flanges, 2850 each are now included - 0.00 bkup is verbal only per AH.
See CHB for commission/
4/14/20 - Rev D - different nozzles - 502720 each tank, sales tax @7% - 21550 each - 3,016,320
Not included
GB - 22100
SS GB - 40504 each
Opt B SS Internal Nozzles 2850
3/3/2020 - same price - proposal made out to CPI instead of Gavilon 3,010m260
1/9/2020 - Changed nozzles - 60.50 cwt - 501,710.00 = x 6=3,010,260
GB - 22100
7% - 21500
total - 545,310 - x 6 =3271860
Revised 9/17 -Added 12\\\\\\\\\\\\\\\" Top Fill Nozzle - carbon steel
$519,490 each time 6 instead of 2. $3,116,940 with GB at 22,100 each x 6=132,600
SG included
GBs add - 22,100 each tank -44200 for both
Each tank - 513660
4/22/2020 - Rev E - SS GB Installed at Reg GB price of 22100 each- Price does not include tx at 7% - 21550 each times 6 tanks - 129300
Opt A - SS Internal flanges, 2850 each are now included - 0.00 bkup is verbal only per AH.
See CHB for commission/
4/14/20 - Rev D - different nozzles - 502720 each tank, sales tax @7% - 21550 each - 3,016,320
Not included
GB - 22100
SS GB - 40504 each
Opt B SS Internal Nozzles 2850
3/3/2020 - same price - proposal made out to CPI instead of Gavilon 3,010m260
1/9/2020 - Changed nozzles - 60.50 cwt - 501,710.00 = x 6=3,010,260
GB - 22100
7% - 21500
total - 545,310 - x 6 =3271860
Revised 9/17 -Added 12\\\\\\\\\\\\\\\" Top Fill Nozzle - carbon steel
$519,490 each time 6 instead of 2. $3,116,940 with GB at 22,100 each x 6=132,600
SG included
GBs add - 22,100 each tank -44200 for both
Each tank - 513660
Address Information
Laremy Seelow
Hastings
NE
Tank Information
0
n/a
n/a
3/04/2021
Inspection Information
n/a
Liner Installation Stage
n/a
Documents