Proposal/Job Go Back
Proposal/Job Information
J.R. Simplot Company - Boardman, OR 97818
2-90x32 LDS Proposal 2021
HTS-4111-0621
LDS
0.00
n/a
6/09/2021
13376.00
Closed/Signed Job
n/a
0.00
10/01/2021
n/a
Job Details/Notes
CHRIS SCHULTZE
LDS System: $3,850 x 2 = $7,700
Annual Subscription: $1,188 x 2 = $2,376
3 Additional Sensors: $1,650 x 2 = $3,300
Total: $6,688 x 2 tanks = $13,376
This does not include an installation charge as these systems would be installed at the time of the internal liner installation
LDS System: $3,850 x 2 = $7,700
Annual Subscription: $1,188 x 2 = $2,376
3 Additional Sensors: $1,650 x 2 = $3,300
Total: $6,688 x 2 tanks = $13,376
This does not include an installation charge as these systems would be installed at the time of the internal liner installation
Address Information
Todd Kisler
Todd Kisler
Boardman
OR
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
