Proposal/Job Go Back
Proposal/Job Information
AgPlus Cooperative - Hendricks, MN 56136
52x32 UTL Proposal 2021
HTS-4073-1120
Liner - Repair
0.00
n/a
1/07/2021
1633.00
Proposal
n/a
0.00
3/12/2021
n/a
Job Details/Notes
Chris Schultze
Material: $1,036 x 1.2 (20%) = $1,243
S/H: $340 + $50 = $390
Total: $1,633
Material: $1,036 x 1.2 (20%) = $1,243
S/H: $340 + $50 = $390
Total: $1,633
Address Information
Don Brown
Wade Eischens
Hendricks
MN
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
