Proposal/Job Go Back
Proposal/Job Information
Central Region Cooperative Fairfax, MN 55332
73 x 32 UTL Proposal 2021
HTS-4082-0121
Liner - UTL
0.00
n/a
1/21/2021
2712.00
Proposal
n/a
0.00
6/18/2021
n/a
Job Details/Notes
Chris Schultze
87.5\' x 85\'
UTL Material Cost: $1,897
HTS (20%): $379
S/H: $50 + $386 = $436
Total: $2,276 + $436 = $2,712
87.5\' x 85\'
UTL Material Cost: $1,897
HTS (20%): $379
S/H: $50 + $386 = $436
Total: $2,276 + $436 = $2,712
Address Information
Butch Altmann
Butch Altmann
Fairfax
MN
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
