Proposal/Job Go Back
Proposal/Job Information
Central Region Cooperative Fairfax, MN 55332
52 x 32 UTL Proposal 2021
HTS-4082-0121
Liner - UTL
0.00
n/a
1/21/2021
1487.00
Proposal
n/a
0.00
6/18/2021
n/a
Job Details/Notes
Chris Schultze
62.5\' x 65\'
UTL Material Cost: $1,036
HTS (20%): $207
S/H: $50 + $194 = $244
Total: $1,243 + $244 = $1,487
62.5\' x 65\'
UTL Material Cost: $1,036
HTS (20%): $207
S/H: $50 + $194 = $244
Total: $1,243 + $244 = $1,487
Address Information
Butch Altmann
Butch Altmann
Fairfax
MN
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
