Proposal/Job Go Back
Proposal/Job Information
The McGregor Company Colfax , WA 99111
33x32 NonLNR Tank Proposal 2021
HT-21-Q6046
Tank - New
0.00
n/a
3/24/2021
207060.00
Proposal
n/a
0.00
6/18/2021
n/a
Job Details/Notes
Chris Schultze
Tank: $173,910
Grade Band: $7,200
Lockable Safety Gate: $1,250
SS Sparge Line: $3,850
SS Appurtenances: $4,850
Cut/Tear Down of existing 33\\\'x32 Tank: $16,000
( a) $17,200 - $1,200 Salvage Rights to Steel = $16,000)
Total: $207,060
Tank: $173,910
Grade Band: $7,200
Lockable Safety Gate: $1,250
SS Sparge Line: $3,850
SS Appurtenances: $4,850
Cut/Tear Down of existing 33\\\'x32 Tank: $16,000
( a) $17,200 - $1,200 Salvage Rights to Steel = $16,000)
Total: $207,060
Address Information
Craig Chatterton
Colfax
WA
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
