Proposal/Job Go Back
Proposal/Job Information
Allied Cooperative Adams, WI 53910
73x32 Liner Replacement 2023
HTS-8335-0123
Liner - New
0.00
n/a
2/01/2023
85500.00
Closed/Signed Job
n/a
9.99
5/04/2023
n/a
Job Details/Notes
5/3/2023 Signed with internal temperature sensors - 2800+75269=78069
Price above does not include the following options
1 - 60 mil liner floor maternal = $7,431
internal tank temp probs = $2,800
5-4-23 - Allied Coop wants the liner and 60 mil floor - $82,700
They also want the two tank probs @ $2,800
total = $85,500
Price above does not include the following options
1 - 60 mil liner floor maternal = $7,431
internal tank temp probs = $2,800
5-4-23 - Allied Coop wants the liner and 60 mil floor - $82,700
They also want the two tank probs @ $2,800
total = $85,500
Address Information
251 Railroad ST
Adams
WI
Tank Information
9192
n/a
n/a
73
32
10-34-0 Ammonium Polyphosphate
Inspection Information
n/a
Liner Installation Stage
n/a
Documents