Proposal/Job Go Back
Proposal/Job Information
Heritage FS Gilman, IL 60938
127x32 w/ liner Tank 3 Inspection 2022
HTS-2877-0622
Inspection
0.00
n/a
6/14/2022
6990.00
Closed/Signed Job
n/a
9.99
8/17/2022
8/17/2022
n/a
Job Details/Notes
8/17/2022 Said he sent in the signed proposal - tank is ready, was wondering when he will be scheduled. Signed 6/15/2022
Address Information
Gilman
IL
Tank Information
12683
n/a
n/a
127
32
32% Nitrogen Solution
Inspection Information
Rick
8/20/2022
8/22/2022
10/06/2022
Liner Installation Stage
n/a
Documents
