Proposal/Job Go Back
Proposal/Job Information
Herrin Fertilizer Mt Pulaski, IL 62548
73x32 TK 2 Warranty Liner Inspection 2021
Warranty
Inspection
0.00
n/a
8/01/2021
0.00
Closed/Signed Job
n/a
0.00
8/15/2021
n/a
Job Details/Notes
Tank 2 Liner\'s that was installed in 2019 was leaking, the tank was inspected, and some rafters had twisted due to floor settlement issue on the center pole. Due to the roof repair the liner was replaced and center pole lengthened on Sept 13, 2021. Liner was installed Sept 30, 2021.
Address Information
Duane Glasgow
Mt. Pulaski
IL
Tank Information
0
n/a
n/a
Inspection Information
8/26/2021
Rick
8/26/2021
8/26/2021
1/14/2021
Liner Installation Stage
n/a
Documents
