Proposal/Job Go Back
Proposal/Job Information
United Farmers Cooperative - Brownton, MN 55312
104x32 LNR UTL Proposal 2022
HTS-4135-0122
Liner - UTL
0.00
n/a
1/07/2022
117107.00
Proposal
n/a
0.00
4/15/2022
n/a
Job Details/Notes
Chris Schultze
Material: $87,440
Geotextile: $7,307
J Bolts: $4,360
Total: $99,107
Installation/Travel: $18,000
Travel Days: 2.5
Installation Days: 3.5
Option:
60 mil bottom with 40 mil shell add: $14,536
Material: $87,440
Geotextile: $7,307
J Bolts: $4,360
Total: $99,107
Installation/Travel: $18,000
Travel Days: 2.5
Installation Days: 3.5
Option:
60 mil bottom with 40 mil shell add: $14,536
Address Information
Jim Carlson
Jim Carlson
Brownton
MN
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
