Proposal/Job Go Back
Proposal/Job Information
United Farmers Cooperative - Brownton, MN 55312
73x32 EXT Coating Proposal 2022
HTS-4136-0122
Coating - Ext
0.00
n/a
1/07/2022
62754.00
Proposal
n/a
0.00
4/15/2022
n/a
Job Details/Notes
Chris Schultze
Litwiller Materials/Labor: $51,863
DBA 10%: $51,863 x 10% = $5,186 = $57,049
HTS 10%: $57,049 x 10% = $5,705 = $62,754
Location has the option of (2) 73\'x32\' tanks
$62,754 x 2 tanks = $125,508
Litwiller Materials/Labor: $51,863
DBA 10%: $51,863 x 10% = $5,186 = $57,049
HTS 10%: $57,049 x 10% = $5,705 = $62,754
Location has the option of (2) 73\'x32\' tanks
$62,754 x 2 tanks = $125,508
Address Information
Jim Carlson
Jim Carlson
Brownton
MN
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
