Proposal/Job Go Back
Proposal/Job Information
Industrial Builders, Inc. - Casselton, ND 58078
52x32 REVA Insulation Proposal 2021
HTS-4121-0721A
Other
0.00
n/a
8/10/2021
119897.00
Proposal
n/a
0.00
9/30/2021
n/a
Job Details/Notes
Chris Schultze
Material: $53,327 x 20% = $10,665 = $63,992
Labor: $33,124 + $3,610 (freight) x 20% = $7,347 = $44,081
Sales Tax (7.5%): $4,799
Bond (6.5%): $7,025
Material: $53,327 x 20% = $10,665 = $63,992
Labor: $33,124 + $3,610 (freight) x 20% = $7,347 = $44,081
Sales Tax (7.5%): $4,799
Bond (6.5%): $7,025
Address Information
David Goulet
Casselton
ND
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
