Proposal/Job Go Back
Proposal/Job Information
Industrial Builders, Inc. - Casselton, ND 58078
54x16 REVA Insulation Proposal 2021
HTS-4121-0721A
Other
0.00
n/a
8/10/2021
90820.00
Proposal
n/a
0.00
9/30/2021
n/a
Job Details/Notes
Chris Schultze
Material: $38,206 x 20% = $7,642 = $45,848
Labor: $26,557 + $3,610 (freight) x 20% = $6,033 = $36,200
Sales Tax (7.5%): $3,439
Bond (6.5%): 5,333
Material: $38,206 x 20% = $7,642 = $45,848
Labor: $26,557 + $3,610 (freight) x 20% = $6,033 = $36,200
Sales Tax (7.5%): $3,439
Bond (6.5%): 5,333
Address Information
David Goulet
Casselton
ND
Tank Information
0
n/a
n/a
Inspection Information
n/a
Liner Installation Stage
n/a
Documents
